LOY YANG POWER & LOY YANG MINE

Loy Yang A is Victoria’s largest power station, producing 30% of the state’s electricity.

Pro Draft provides drafting services, 3D modelling, measuring and technical assistance to Loy Yang Power and its contractors on major and minor projects.

2007-2016 Unit 2, 3 & 4 Major Outages – Drafting Services in support of:

  • New high efficiency turbine cylinder installations
  • Generator refurbishments and upgrades
  • Boiler Gas Outlet Duct refurbishment
  • Main firing burner duct replacements
  • Auxiliary fuel burner upgrades & replacements
  • Quality control checking of components prior to start of outage
  • Return to Store audit of unused items on completion of outage

2012 Ladder Compliance Audit to AS 1657

  • Identified 600 ladders for replacement, repair or removal
  • Defined objectives, goals, actions and measures
  • Created audit template and database
  • Used reporting mechanisms to help prioritise works
  • Worked to a project-plan to meet targets

Loy Yang Mine is the largest brown coal mine in Australia providing the fuel source for both Loy Yang A & B power stations. Pro Draft provides on-site electrical and mechanical drafting services, 3D Modelling, measuring and technical assistance to the Loy Yang Mine.

2016 Tripper Stacker 4 Major Outage – Drafting Services in support of:

  • Detailed 3D modelling for internal layout of electrical switchgear & external envelop for the new switchroom. (Stacker)
  • Detailed 3D modelling of the internal layout of the switchgear and new floor plates. (Tripper)
  • New access walkways to switchrooms
  • Installation of new Stacker switchroom (including Lube room and Resistor room) Including 25Tonne C-Frame Lifting beam.

2015 Dredger No 15 Major Outage – Electrical Switchrooms, Loading Unit & Digging Unit (HV & LV)

  • Detailed 3D modelling for internal layout of electrical switchgear & external envelop for the new switchroom.
  • New access walkways to switchrooms.
  • Removal/Installation of existing switchroom.

Support Trestle

  • Detailed model for solidworks analysis

New VSD Motors

  • Adapt existing structure to accommodate new drives.
  • Design guarding to AS standards for new drives.

2014 Dredger No 15 Electrical Switchroom Piping – New insulated chiller piping for VSD upgrade

  • Ablution block plumbing

Cabling – extensive 3D modelling for cable runs on Digging Unit underframe

Fire & General Service Piping

  • 3D modelling for portable PRV sled

2014 Dredger No 16 Bucketwheel weightometer installation

  • Detailed 3D modelling of bucketwheel boom
  • Calculate mass for machine stability

2011-2012 Dredger No.14 & 15

  • D15 Bucket Wheel replacement – Modelled new and existing wheels & chutes
  • Detailed drawings for Bucket Wheel lug repair
  • Detailed drawings of welding jigs required to centralise lug inserts & stabilise welding process
  • Created removal & installation drawings for digging-unit steering-screw
  • Detailed drawing for civil works & structural modifications